Installation of 15x CRAC Systems to Main Building Server Rooms
This Mechanical & Electrical (M&E) client required the installation of 13x CRAC systems to be installed a new landmark building in the Liverpool Street area.
Due to working in high voltage electrical equipment rooms, health & safety was critical in providing a smooth transition in delivering this project.
Heavy duty containment services were installed to protect the refrigerant pipework and interconnecting installed services. The outdoor condensers were installed on a high level gantry floorplate area, above a loading bay which was in constant use.
Each CRAC system was installed on a one by one replacement basis in order for cooling to be constant in the room so that the existing live electrical equipment did not overheat.
This was a demanding project, but everyone of the team pulled together to achieve the completion date. Another one in the portfolio.